US-101 HOV LANE EIR/EIS STUDY
County of Ventura
- Mainline freeway counts at 36 locations.
- AM and PM vehicle turning movement with pedestrian and bicycle counts at 72 intersections.
- AM and PM vehicle classification turning movement with pedestrian and bicycle counts at 63 freeway ramp intersection.
US-101 RAMP METERING IMPLEMENTATION STUDY
County of Marin
- 5-hour PM freeway vehicle travel time surveys using 3 vehicles for 3 days.
- 5-hour PM on and off-ramp vehicle counts at 27 freeway locations for 3 days.
- 5-hour PM vehicle counts at 3 mainline freeway locations for 3 days.
- 5-hour PM queue length and occupancy vehicle counts at 15 on-ramp locations for 3 days.
- 72-hour vehicle ADT machine counts at 8 arterial locations for 3 days.
I-605/SR-91 PA/ED STUDY
County of Los Angeles
- 48-hour mainline freeway classification counts at 2 locations.
- 48-hour freeway-to-freeway connector classification counts at 3 locations.
- 72-hour freeway ramp classification counts conducted at 12 locations.
- AM and PM peak period vehicle turning movement, pedestrian and bicycle counts at 7 intersections.
- 24-hour ADT machine counts at 13 locations.
I-5 CORRIDOR SYSTEM MANAGEMENT PROGRAM
County of San Diego, CA
- 4-hour AM and 4-hour PM manual vehicle turning movement counts at 133 intersections.
- Vehicle classification counts at 4 freeway-to-freeway connectors
- Mainline freeway counts at 3 locations.
I-80 INTEGRATED CORRIDOR MOBILITY PROJECT
Counties of Alameda and Contra Costa, CA
- AM and PM peak period vehicle turning movement counts at 32 intersections.
- 9-hour vehicle classification counts at 13 mainline freeway locations.
- 72-hour ADT machine counts at 10 locations.
I-605 FREEWAY HOTSPOTS STUDY
County of Los Angeles
- 6-hour vehicle turning movement counts at 74 intersections.
- 15-hour vehicle classification turning movement counts at 20 intersections.
- 6-hour vehicle turning movement counts at 20 freeway ramp intersections.
- 15-hour vehicle classification counts at 4 mainline freeway locations.
- 7-hour vehicle counts at 8 freeway-to-freeway connector locations
SR-4 RAMP METERING STUDY
County of Contra Costa
- 72-hour ADT machine counts conducted at 30 ramp locations.
- 72-hour manual counts conducted at 10 freeway-to-freeway connector locations.